|
Year
|
Location
|
|
Installation
|
ID (mm)
|
Type of internals
|
2005 |
Yunnan |
H2Sabsorber
CO2absorber
CO2expended column
H2Sreabsorber
Heat acrifier column |
Methanol |
2400
1800
3000
3000/1800
2200 |
EDV valve tray |
2005 |
Beijing |
Methanol column washer A
H2S concentrating tower A
Heat acrifier column A
Methanol dehydration A
Water washer A
Amine washer A
Methanol washer B
H2S concentrating tower B
Heat acrifier column B
methanol dehydration B
Water washerB
Amine washer B |
Methanol |
3800
4400
5400/3900
1500
4000
3200
3800
4400
5400/3900
1500
4000
3200 |
EDV valve tray |
2004 |
Henan |
Methanol main column |
Methanol |
1600 |
EDV valve tray |
2004 |
Yunnan |
Methanol predistillation column
Methanol pressure distillation column
Methanol atmospheric column |
Methanol |
1200
1400
1800 |
EDV valve tray |
2004 |
Shanxi |
Heater actifier column
Azeotrope column
Methanol water separation column |
Low temperature methanol washer |
1972
1076
1372 |
EDV valve tray |
2004 |
Jilin |
Methanol pre-column
Pressure column
Atmospheric column |
Methanol |
1000
900
1200 |
EDV valve tray |
2002 |
Shanghai |
Shift gas absorber
H2S concentrating tower
Methanol actifier column
Methanol dehydration
Shift gas water scrubber
Gas water scrubber
Gas methanol absorber |
Low temperature methanol washer |
1700
2300
2100
1000
1700
1100
1200 |
EDV valve tray |
2002 |
Sichuan |
Water washer
Methanol pre-column
Distillation column |
Methanol |
800
800
2000 |
EDV valve tray |
2001 |
Zhejiang |
Methanol predistillation column
Methanol pressure distillation column
Methanol atmospheric distillation column |
Methanol |
1200
1600
2200 |
EDV valve tray |
2000 |
Shanxi |
Methanol main column
Methanol pre-column |
Methanol |
1400
1000 |
EDV valve tray |
2000 |
Shanxi |
Methanol main column
Methanol pre-column |
Methanol |
1200
1000 |
EDV valve tray |
2000 |
Heilongjiang |
Methanol main column
Methanol pre-column |
Methanol |
1600
1000 |
EDV valve tray |